Network location data

Electricity network data is required for drawing up a construction project. To receive network location data, please submit an application in our self-service.

Requesting network location data

A basic drawing of the site plan with the data area outlined must be enclosed with the application (in DWG format, using L-Est coordinate system). Authorised persons must enclose their authorisation if applying for the first time.

To prove the ownership, we request the landowners to present a statement from the landregister.

Geodetic ground plans will not be issued separately. The location of the electricity network will be checked later during project coordination.

The statement will be provided within 10 working days

How much does issuing network location data cost?

Standard request

18.30

Areas larger than 3 ha or work volume exceeding 2 hours

73.20

Owner or legal user of the land

FREE OF CHARGE when submitting a statement from the land register

Additional information about issuing data

As location data, we will issue a statement from our electricity network database and also digital drawings, if available.

[email protected]