Skip to content

Installing a meter

A meter has to be installed if you want:

  • a meter at a new place of consumption;
  • to replace a single-phase meter with a three-phase meter;

Apartment building

  • Installing a meter may be required if a new place of consumption is built in the apartment building, such as a new apartment.
  • Replacing the meter may be required if you want to replace a single-phase meter with a three-phase meter.

Installing a three-phase meter requires the connection point of your apartment building to have a three-phase network connection.

Private house

  • If you want to replace a single-phase meter in a private house with a three-phase meter, submit an application to transfer the connection point to a three-phase network connection.

Works in an apartment building

  1. 1

    Get consent

    Get written consent from the apartment association or residents of the building to install or replace the meter.

  2. 2

    Organise the required work

    Arrange the work outlined in the technical inspection document to be done by a licensed electrician:

    Transfer of the place of consumption in an apartment building from single-phase to three-phase (pdf)Installation of a meter in an apartment building (pdf)
  3. 3

    Place an order

    When the works outlined in the technical inspection document are completed, place an order.

    Order installation of a meter

    When placing an order, attach the consent document.

  4. 4

    We install or replace the meter

How much does it cost to install or replace a meter?

Installing or replacing a meter

62.22 € *

A sealing fee will be added to the meter installation fee if the meter is sealed at a different time from when the meter is installed.

If it turns out that at the place of consumption the customer has not done the necessary work, a call-out fee is added - 30.50 €.