Installing a meter
A meter has to be installed if you want:
- a meter at a new place of consumption;
- to replace a single-phase meter with a three-phase meter;
Apartment building
- Installing a meter may be required if a new place of consumption is built in the apartment building, such as a new apartment.
- Replacing the meter may be required if you want to replace a single-phase meter with a three-phase meter.
Installing a three-phase meter requires the connection point of your apartment building to have a three-phase network connection.
Private house
- If you want to replace a single-phase meter in a private house with a three-phase meter, submit an application to transfer the connection point to a three-phase network connection.
Works in an apartment building
- 1
Get consent
Get written consent from the apartment association or residents of the building to install or replace the meter.
- 2
Organise the required work
Arrange the work outlined in the technical inspection document to be done by a licensed electrician:
Transfer of the place of consumption in an apartment building from single-phase to three-phase (pdf)Installation of a meter in an apartment building (pdf) - 3
Place an order
When the works outlined in the technical inspection document are completed, place an order.
Order installation of a meterWhen placing an order, attach the consent document.
- 4
We install or replace the meter
How much does it cost to install or replace a meter?
Installing or replacing a meter
62.22 € *
A sealing fee will be added to the meter installation fee if the meter is sealed at a different time from when the meter is installed.
If it turns out that at the place of consumption the customer has not done the necessary work, a call-out fee is added - 30.50 €.